Evaluating Project Owner Satisfaction and Strategic Improvement Priorities in WIKA’s Wosusokas Water Supply System Project
##plugins.themes.EpsilonTheme.article.main##
Fauzi Ramadhan Hasibuan*
A.A.B. Dinariyana
Regional water supply system development is a national priority in Indonesia, yet project success is still commonly assessed through physical progress rather than the perceptions of the public agencies that commission the work. This study evaluates the satisfaction of the Ministry of Public Works as project owner with the project management performance of PT Wijaya Karya (Persero) Tbk. in the Wosusokas Regional Water Supply System (SPAM) Project, since 100% physical completion in Segments 2 and 4 does not by itself indicate that owner expectations were met. An ex post quantitative design was applied, with respondents comprising the Commitment Making Officer, work-unit representatives, and technical personnel from the owner’s side. Data were gathered through importance–performance questionnaires, project documents, and expert judgment obtained in focused discussions, and analysed using the Customer Satisfaction Index (CSI), Importance–Performance Analysis (IPA), and the Analytic Hierarchy Process (AHP). The CSI reached 88.53%, indicating that the owner was satisfied. IPA nevertheless identified four priority attributes: system reliability after handover, handling of material and equipment delay risk, overall satisfaction, and the possibility of future cooperation. AHP ranked strengthening supply-chain risk management as the leading strategy, followed by digitalizing project reporting and communication, strengthening partnering with the owner, improving testing and after-handover procedures, and developing competence and K3/HSE culture. Owner satisfaction thus offers a basis for continuous improvement beyond physical progress.
Astana, I. N. Y., Hidayati, A. M., & Sastra, I. N. G. S. (2023). Customer Satisfaction Analysis of Project Performance at PUPRKIM Bali Province. Journal of Asian Multicultural Research for Economy and Management Study, 4(3), 55–65. https://doi.org/10.47616/jamrems.v4i3.399
Awatara, I. G. A. G. U., Indiani, N. L. P., & Wahyuni, N. M. (2024). The Role of Satisfaction and Trust in Mediating the Relationship Between Payment Method and Vendor Loyalty (Study on Construction Company PT. Wijaya Karya). International Journal of Environmental, Sustainability, and Social Science, 5(5), 1183–1196. https://doi.org/10.38142/ijesss.v5i5.1126
Creswell, J. W. (2013). Educational research: Planning, conducting, and evaluating. W. Ross MacDonald School Resource Services Library.
Drexler, J. A., & Larson, E. W. (2000). Partnering: Why Project Owner-Contractor Relationships Change. Journal of Construction Engineering and Management, 126(4), 293–297. https://doi.org/10.1061/(asce)0733-9364(2000)126:4(293)
Firmansyah, E., Tulim, A., Hastalona, D., & Zalukhu, D. (2022). Pengaruh Perputaran Kas, Perputaran Piutang Dan Perputaran Modal Kerja Terhadap Rentabilitas Pada PT Wijaya Karya. AKUA: Jurnal Akuntansi Dan Keuangan, 1(1), 18–27. https://doi.org/10.54259/akua.v1i1.270
Haverila, M., Haverila, K. C., & Twyford, J. C. (2020). Critical variables and constructs in the context of project management: importance-performance analysis. International Journal of Managing Projects in Business, 14(4), 836–864. https://doi.org/10.1108/ijmpb-02-2020-0071
Kamaluddin, T. M., Basong, A., & Sane, J. M. (2019). Performance Analysis of Implementation of Construction Projects with Customer Satisfaction Index (CSI) in Building Projects. International Journal of Science and Research (IJSR), 8(12), 608–613. https://doi.org/10.21275/ART20203198
Kärnä, S., Sorvala, V., & Junnonen, J. (2009). Classifying and clustering construction projects by customer satisfaction. Facilities, 27(9/10), 387–398. https://doi.org/10.1108/02632770910969621
Kawesittisankhun, K., & Pongpeng, J. (2020). Social Sustainability: Satisfying Owners and Communities by Multilevel Strategies of Contractors. Sustainability, 12(5), 2131. https://doi.org/10.3390/su12052131
Kemenkes. (2021). Peta Jalan Pengawasan Kualitas Air Minum Nasional (2020-2030). Kementrian Kesehatan Republik Indonesia. https://ayosehat.kemkes.go.id/peta-jalan-pengawasan-kualitas-air-minum-nasional-2020-2030
Khorunisa, A. R., & Hermuningsih, S. (2023). Analisis Perbandingan Kinerja Keuangan PT Wijaya Karya TBK dengan PT Adhi Karya TBK. Jurnal Impresi Indonesia, 2(5), 459–467. https://doi.org/10.58344/jii.v2i5.2451
Kunkcu, H., Koc, K., Dagou, H. H., & Gurgun, A. P. (2022). Using Key Performance Indicators in Construction Project Literature. Proceedings of International Structural Engineering and Construction, 9(2), 1–6. https://doi.org/10.14455/isec.2022.9(2).con-12
Lee, S. W., & Xue, K. (2021). An integrated importance-performance analysis and modified analytic hierarchy process approach to sustainable city assessment. Environmental Science and Pollution Research, 28(44), 63346–63358. https://doi.org/10.1007/s11356-021-15235-0
Lehtiranta, L., Kärnä, S., Junnonen, J.-M., & Julin, P. (2012). The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), 463–475. https://doi.org/10.1080/01446193.2012.669485
Li, H., Bari, A., & Yue, A. (2024). Mechanistic Analysis of the Evolution of Trust Level Between Owner and PMC Contractor Based on Dynamic Bayesian Network. Buildings, 14(11), 3373. https://doi.org/10.3390/buildings14113373
Li, H., Liang, M., Han, H., & Zhang, W. (2023). Building mechanism of the initial trust motivation of owners toward contractors. Journal of Engineering, Design and Technology, 23(1), 51–68. https://doi.org/10.1108/jedt-06-2022-0331
Madeppungeng, A., Intari, D. E., & Fauziah, N. N. (2020). Evaluasi Kepuasan Pelanggan terhadap Kinerja Manajemen Proyek Kontraktor Besar (Studi Kasus: Proyek Pembangunan Bendungan KLM di Provinsi Banten). Konstruksia, 11(2), 59–72. https://doi.org/10.24853/jk.11.2.59-71
Moree, W., Bakker, H. L. M., Suprapto, I. M., & Veeneman, W. W. (2013). The Influence of Different Contract Types on the Effectiveness of Owner-Contractor Relationships in Construction Projects. Delft University of Technology.
Mukramin, S. C., Thambas, A. H., Dundu, A. K. T., & Malingkas, G. Y. (2024). Analisis kepuasan pelanggan terhadap kinerja kontraktor pada proyek sistem penyediaan air minum di Kabupaten Minahasa Utara. PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 13(2), 187–198. https://doi.org/10.22225/pd.13.2.10183.187-198
Othman, A. A. E. (2015). An international index for customer satisfaction in the construction industry. International Journal of Construction Management, 15(1), 33–58. https://doi.org/10.1080/15623599.2015.1012140
Pak, R. J. (2013). Combining Importance-Performance Analysis with Analytic Hierarchy Process for Enhancing Satisfaction. Journal of Advanced Management Science, 1(4), 368–371. https://doi.org/10.12720/joams.1.4.368-371
Papanikolaou, M., & Xenidis, Y. (2020). Risk-Informed Performance Assessment of Construction Projects. Sustainability, 12(13), 5321. https://doi.org/10.3390/su12135321
Putri, A. A. E., & Maielyana, R. (2025). Financial Ratio Analysis and Health Level of PT Wijaya Karya (Persero) Tbk Based on Altman Z-Score. Jurnal Akuntansi, Ekonomi Dan Manajemen Bisnis, 13(1), 178–186. https://doi.org/10.30871/jaemb.v13i1.8560
Putri, F. P., Kennedy, K., & Kurnia, P. (2015). Pengaruh Pengetahuan Auditor, Pengalaman Auditor, Kompleksitas Tugas, Locus of Control, dan Tekanan Ketaatan terhadap Audit Judgment (Studi Kasus pada Perwakilan BPKP Provinsi Riau). Jurnal Online Mahasiswa (JOM) Fakultas Ekonomi, 2(2), 1–15. https://jom.unri.ac.id/index.php/JOMFEKON/article/view/8731
Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83–98. https://doi.org/10.1504/IJSSCI.2008.017590
Sugiyono. (2017). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Alfabeta.
Syamil, A., Samosir, J. M., & Heriyati, P. (2021). The Impact of Project Performance on Customer Satisfaction. Turkish Journal of Computer and Mathematics Education (TURCOMAT), 12(3), 5658–5668. https://doi.org/10.17762/turcomat.v12i3.2240
Tongco, M. D. C. (2007). Purposive Sampling as a Tool for Informant Selection. Ethnobotany Research and Applications, 5, 147–158. https://ethnobotanyjournal.org/index.php/era/article/view/126
Usboko, G. P., & Adi, T. J. W. (2020). An Analysis of Contractor Satisfaction on Owner Team Performance in Construction Projects (Case Study: Construction Projects in ITS). KnE Social Sciences, 4(14), 733–746. https://doi.org/10.18502/kss.v4i14.7931
Widiyastuti, S., Rachmawati, Rohani, S., Puspitasari, D., & Lolita. (2025). Study of Drinking Water Supply System (SPAM) regulations after the enactment of Law Number 6 Year 2023 About Job Creation. IOP Conference Series: Earth and Environmental Science, 1438(1), 12059. https://doi.org/10.1088/1755-1315/1438/1/012059